There is excellent reading in the link above. The chromite project PDF is 8MB and takes a bit of time to download. The information is very detailed.
The Sept. 9, 2010 preliminary assessment of the Eagles Nest by Noront is getting more attractive.
The planned infrastructure includes an all-season road, power line, and winter roads during construction. This infrastructure will benefit other companies and local communities. Although the Project could carry 100% of these costs, the PA assigned 25% of the all season road, 50% of the power line and 50% of the winter road costs against the Project.