HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Re: Who is working at ROF?
18
Nov 12, 2013 09:15AM
23
Nov 12, 2013 10:25AM
16
Nov 12, 2013 11:18AM
6
Nov 12, 2013 12:09PM
5
Nov 12, 2013 12:22PM
5
Nov 12, 2013 12:44PM
CT:- I think the ramp will speed up too. Paul S. Told me at the recent AGM that the FS timeline would be met. The time lost through delayed permits , for example, would be made up via already proven but new drilling techniques. If required, he said that huge machinery/ bulldozers would be cut up; helecoptered in; reassembled on site. He told me this at the recent AGM. I spoke to A . Coutts at same AGM just before talking to Semple, Couts confirmed to me that the FS timeline would be met. He also said that very large construction company such as the one that has built/ still building the Boston tunnel could do it. Coutts said it is the same company which was hired to build the raglan ni mine when Coutts was in charge of building it, These people can do anything to any timeline. "It's just engineering, said Semple" to me. So ...... All is possible , including increased drilling of the exploration kind. While ramp/ mine building, Peter
13
Nov 12, 2013 01:32PM
7
Nov 12, 2013 01:37PM
1
Nov 12, 2013 01:45PM
15
Nov 12, 2013 02:30PM
Share
New Message
Please login to post a reply