https://www.newswire.ca/news-releases/noront-provides-eagles-nest-triple-j-assay-results-exploration-update-atmcfaulds-lake-james-bay-lowlands-539819701.html
In this 2010 news, Noront requested that the entire sample interval be assaved !!!!
But I'm not aware if we saw anything on this after ?
------------------
Noront has received results from the follow up sampling of hole NOT-09-070-W1 which intersected extremely high grade platinum and palladium last fall. Noront requested that the entire sample interval be assayed for the full suite of platinum group elements including rhodium, iridium, osmium, ruthenium and rhenium.
Results indicate that anomalous rhodium (Rh), iridium (Ir), osmium (Os), Ruthenium (Ru) and rhenium (Re) are present in the Eagle's Nest deposit. At this stage it appears that the high grade platinum and associated platinum group elements are coincident with and likely controlled by an extensive structure which is steeply dipping and intersects the Eagle's Nest deposit. Future infill drilling at Eagle's Nest will specifically target other portions of this structure within the deposit.