The URL is here, so everyone get look:
chrome-extension://efaidnbmnnnibpcajpcglclefindmkaj/https://coremsymposium.com/wp-content/uploads/2023/10/Presentation-Blair-Kelly.pdf
My underlining is below (note: You may see that there were no "challenges" with the PYR product)
From the Report:
Bunker C (HFO) used in induration furnaces
• We have six induration furnaces equipped with more than 100
burners in operation
• Pyrolytic oil is available as a substitute
• Compatible with existing burners
• Challenges with miscibility with fossil fuels and compatibility with
conduit/storage material properties
• Hydrogen production and combustion
• Electrolysis of water or reforming of biomass
• Storage and transport challenges
• Electric heat transfer via plasma burners