Welcome to the Silver Falcon Mining HUB on AGORACOM

(Edit this Message from the "Fast Facts" Section)

Free
Message: Positive Thoughts

Here is another good message. Since I can't reply (uno post por dayo) on the other board, here you go.

"We're expecting too many good things such as lab results with projected value on the 500k tons, 10K, Smelter being finished, TV announcement, etc."
________________________________________________________________

Those items including but not limited to the etc. being drilling in Sinker Tunnel starting soon(in Sinker Tunnel now), buying back more shares,and increasing the rate of production. The question is can the mill site be expanded to 5000 tons a day and the answer is yes, but it will take 3 months to do it to take out what is considered to have a 15 to 20 year reserves. At 5000 tons a day, all the shares can be bought back within 2 months at an average of 2.25 ounces per ton(an average of the 14 mines that SFMI has). This would put the share value well over $40.00 a share.

As I see it.

Share
New Message
Please login to post a reply