Neil wasn't there when I stopped at the booth.
Drilling should start within the next week or so on the Freewest JV. Because of NOT's nearby camp, they can now continue drilling non stop through the spring melt down. So the delay in start up should not hurt them.
$2 mil translates into roughly 5,000 meters of drilling or approx. 25 holes of 200 meters average.
No drilling on the UC JV any time soon, as they have still to do a lot of work on the ground (grids) etc. but they have the JV sign-off for that work.