Re: PROGRESS REPORT, from GBB website, 7 April 2011
in response to
by
posted on
Apr 09, 2011 04:48PM
So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.