Welcome To the Gold Bullion Development Corp. HUB On AGORACOM

So far in 2015, three trenches have been completed in the area covering the smallest proposed pit located furthest west with channel sampling from the middle trench, TR15-11, returning 6.05 g/t Au over 8 m including 14.98 g/t Au over 3 m.

Free
Message: PROGRESS REPORT, from GBB website, 7 April 2011

Seems that someone felt shareholders needed a reminder of the company's aims and expectations at Granada; current share price shows many don't have an idea of the potential or historically 'proven' deposits here.

Drilling is outlining a large low grade deposit, also historic mining followed rich veins and stopped when AU price was very low, leaving high grade ore underground.

Also worth noting is that a bulk sample has already been processed, showing actual recovery and grades, not pie-in-the-sky.

Share
New Message
Please login to post a reply