Welcome To the WIN!!! St. Elias Mines HUB On AGORACOM

Keep in mind, the opinions on this site are for the most part speculation and are not necessarily the opinions of the company WITHOUT PREJUDICE

Free
Message: Re: Sunday Art by Sculpin
3
Jul 10, 2011 11:26AM
3
Jul 10, 2011 11:38AM
4
Jul 10, 2011 12:46PM
3
Jul 10, 2011 02:56PM
3
Jul 10, 2011 03:48PM

Jul 11, 2011 07:56AM

hi endless,

Trenching is not mentioned on my diagram. Thr drawn red line is our property boundary, the lime green lines where to represent the anomalies. To date, we have not posted any diagram showing the trenching. This will come when we get the nr on the actual location of trenching. For now, we only now the general area of the trenching as shown in the excerpt from a recent news release, below.

As at May 31, 2011, 15 trenches totalling 1,200 linear metres have been completed with 215 samples

collected over 5m sample intervals from the trenches at the Tesoro Project. The trenches were completed

by a backhoe and a track-mounted excavator at Zona Central (Main Structural Corridor) and Zona Este

(Parallel Structural Corridor).

It was also mentioned that we will be trenching between Zona Central and Zona Canchete, I assume that trenching may be going on now, or completed. It was mentioned somewhere that the trenching program would be 5 weeks long, we are well past the 5 weeks, so its possible that most, if not all, the trenching is complete.

IMO

4
Jul 11, 2011 10:41AM
2
Jul 16, 2011 10:53AM
Share
New Message
Please login to post a reply