hi endless,
Trenching is not mentioned on my diagram. Thr drawn red line is our property boundary, the lime green lines where to represent the anomalies. To date, we have not posted any diagram showing the trenching. This will come when we get the nr on the actual location of trenching. For now, we only now the general area of the trenching as shown in the excerpt from a recent news release, below.
As at May 31, 2011, 15 trenches totalling 1,200 linear metres have been completed with 215 samples
collected over 5m sample intervals from the trenches at the Tesoro Project. The trenches were completed
by a backhoe and a track-mounted excavator at Zona Central (Main Structural Corridor) and Zona Este
(Parallel Structural Corridor).
It was also mentioned that we will be trenching between Zona Central and Zona Canchete, I assume that trenching may be going on now, or completed. It was mentioned somewhere that the trenching program would be 5 weeks long, we are well past the 5 weeks, so its possible that most, if not all, the trenching is complete.
IMO