The location of Dynacor's mill (from Brophy's 2008 Tech Report)
From the north end of the property, it is about 10 km northwest as the crow flies to the Dynacor Gold Mill, which is a 60 tpd plant with both cyanuration and flotation units. However, to reach the plant by road, it is necessary to return 38 km to Otapara and travel an additional 30 km east along the road on the south side of the Acari River. The Dynacor operations are described more fully in section 17 (adjacent properties).
The link to the tech reports was posted and can answer a few of these questions. The 2010 report takes a while to load as it is over 200 pages.