Re: (Eaglehead 2015 plans)
in response to
by
posted on
Apr 17, 2015 02:47PM
CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
OK, I called Carmax to ask about the work plans for this year. It has not been finalized apparently but the major part of the 2015 plan will be re-logging of the cores. There won't be a major expenditure but will be drilling strategic holes to connect the existing zones. The major factor is to allocate funds to bring the most 'meat' to the story.