Re: More to my post
posted on
Jun 12, 2015 04:15PM
CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)
ExplorationGuy showed us that the Joint Venture Agreement specifically calls for the updating of the BFS with the Optimzation results.
No it doesn't. The decision to update the FS is independent of any other work and, in fact, requires a separate Program to be initiated by the Operator. To my knowledge they have not said they are doing any work on a Feasibility.
There is no reference to optimization studies in the JV.