Welcome To the Copper Fox Metals Inc. HUB On AGORACOM

CUU own 25% Schaft Creek: proven/probable min. reserves/940.8m tonnes = 0.27% copper, 0.19 g/t gold, 0.018% moly and 1.72 g/t silver containing: 5.6b lbs copper, 5.8m ounces gold, 363.5m lbs moly and 51.7m ounces silver; (Recoverable CuEq 0.46%)

Free
Message: Re: SC PFS (2008) vs. FS (2013) and possible FS/PEA (2021)

Here's the latest with a couple of changes done.  It lowers the NPV a little, but still pretty decent numbers!

 

 

PFS (2008)

FS (2013)

FS/PEA (2021)

Tonnage

100 000 tpd

130 000 tpd

133 000 tpd

Mine Life

22.6 years

21 years

28 years

 

 

 

 

Reserves

821.1 MT

940.8 MT

1293 MT

 

 

 

 

Grades

 

 

 

Copper (Cu)

0.25%

0.27%

0.26%

Gold (Au)

0.18 g/t

0.19 g/t

0.16 g/t

Silver (Ag)

1.55 g/t

1.7 g/t

1.2 g/t

Moly (Mo)

0.019%

0.018%

0.017%

 

 

 

 

Recoveries

 

 

 

Copper (Cu)

88.4%

86.6%

88.4%

Gold (Au)

81.3%

73%

81.3%

Silver (Ag)

70.7%

48.3%

70.7%

Moly (Mo)

71.3%

58.8%

71.3%

 

 

 

 

Total production (LOM)

 

 

 

Copper (Cu)

4.762B lbs

4.875B lbs

6.586B lbs

Gold (Au)

4,493T oz.

4,213T oz.

5,312T oz.

Silver (Ag)

32.5M oz.

25.1M oz.

33.4M oz.

Moly (Mo)

255.2M lbs

214.9M lbs

303.8M lbs

 

 

 

 

Annual production (LOM)

 

 

 

Copper (Cu)

211M lbs

232M lbs

235M lbs

Gold (Au)

199T oz.

201T oz.

190T oz.

Silver (Ag)

1.4M oz.

1.2M oz.

1.2M oz.

Moly (Mo)

11.3M lbs

10.2M lbs

10.9M lbs

 

 

 

 

Annual production

 

(Y 1-7)

(Y 1-7)

Copper

 

261M lbs

264M lbs

Gold

 

247T oz.

234T oz.

Silver

 

1.2M oz.

1.2M oz.

Moly

 

9.8M lbs

10.5M lbs

CuEq

 

425.1M lbs

412.5M lbs

 

 

 

 

Annual production

 

(Y 8-21)

(Y 8-28)

Copper

 

204M lbs

226Mlbs

Gold

 

164T oz.

175T oz.

Silver

 

1.0M oz.

1.2M oz.

Moly

 

10.2M lbs

10.8M lbs

CuEq

 

331.3M lbs

347.1M lbs

 

 

 

 

Total cost per lbs of Cu

$1.17 CA

$2.09 CA

$1.50 CA

 

 

 

 

Price

 

 

 

Copper (lbs)

$3.12

$3.25

$3.15

Gold (oz.)

$692.85

$1445

$1445

Silver (oz.)

$13.09

$27.74

$17.50

Moly (lbs)

$33.00

$14.64

$10

Exchange rate

1

0.97

0.77

 

 

 

 

Capex

2.95B

3.2B

2.8B

Construction time (years)

3

5

4

Payback (years)

4.7

6.5

3.5

 

 

 

 

Pre-tax NPV (8%)

2.76B

513M

5.6B

IMO.

MoneyK

Share
New Message
Please login to post a reply