"Elabroating further on confirming the grade at depth (notably on T1), he said they will need to put down a ramp and conduct a bulk sample at +/-100m in order to have the grade be 43-101 compliant down to depth."
Now this really will take some time acquiring permits, ramping and sampling. We'll get sore butts sitting on the edges of our chairs that long. Hopefully the hors d'oevres before the main meal will be substantial to keep us going.