HIGH-GRADE NI-CU-PT-PD-ZN-CR-AU-V-TI DISCOVERIES IN THE "RING OF FIRE"

NI 43-101 Update (September 2012): 11.1 Mt @ 1.68% Ni, 0.87% Cu, 0.89 gpt Pt and 3.09 gpt Pd and 0.18 gpt Au (Proven & Probable Reserves) / 8.9 Mt @ 1.10% Ni, 1.14% Cu, 1.16 gpt Pt and 3.49 gpt Pd and 0.30 gpt Au (Inferred Resource)

Free
Message: Cost of Road

I'm not an engineer but that was the information provided by Not management at one of their presentations. They were the ones qouting those figures.  I believe they said that road to the reserve was being but in at a cost of $13,000 per lilometer.

As a person who has spent many hours in the back woods down logging roads and such, I can tell you that with space and no developement to go around roads can be built cheap.  The area property won't have the be purchased at a premium nor does the road have to be engineered for high volume and fast moving traffic.  The road will only need to be functional and load bearing.

 

Keep the Faith

Share
New Message
Please login to post a reply